Precise Surveying - Field Applications & Concepts
3. Enter the latitude, longitude and ellipsoidal height of the
first reference point.
4. Set horizontal or/and vertical control for the first reference
point. This means requiring that the local grid pass
through respectively the horizontal or/and vertical position
of the point.
5. Resume the previous three steps until all the reference
points have been defined.
6. Run the localization process and make sure the local grid
is now the new projection system used in the job.